Creamery Business Guide

Licensing & Regulations

Do You Need a HACCP Plan for a Creamery?

Most creameries need a written food safety plan, but not necessarily one titled HACCP. Federal HACCP rules are mandatory for seafood, juice, and meat and poultry, not dairy generally. Dairy processors usually fall under FDA's preventive controls rule under FSMA, a lighter version for very small businesses, plus the Pasteurized Milk Ordinance for Grade A plants and whatever your state adds.

A plan is a list of what could hurt someone, what you do about it, and records proving you did it. If you can follow a recipe, you can write one.

Which rule applies to you

Qualified facility status

FDA's preventive controls rule defines a "very small business" by an average annual sales ceiling, adjusted for inflation. Those facilities are exempt from the full hazard analysis and risk-based preventive controls requirements. They still follow current good manufacturing practice and submit an attestation to FDA, renewed on a set cycle. Status is recalculated, so growth can move you into the full rules. Confirm the current ceiling and your status with FDA or your regulator.

Your license program

Grade A plants operate under the Pasteurized Milk Ordinance, which has its own HACCP option. Some states expect hazard analysis even from manufacturing plants. Ask your state regulator what is required and what is optional.

Your buyers

Chains, distributors and school programs often demand a written plan or audit regardless of law. If wholesale is coming, see getting dairy into grocery stores.

SituationUsually applies
Very small cheese plant, local salesAttestation, good manufacturing practice, state rules
Larger plant, not Grade AFull written plan under preventive controls
Grade A bottlingPMO, optional HACCP, federal rules explained by your regulator
Large wholesale buyerBuyer's requirements, often plan and audit

What the plan contains

  • Process flow from milk receiving to delivery, on one page.
  • Hazard analysis for each step: pathogens such as Listeria, Salmonella and pathogenic E. coli, allergens, sanitizer residue and foreign material.
  • Preventive controls for significant hazards, such as pasteurization, cooling, cold storage, sanitation and allergen handling.
  • Monitoring: what is measured, how often, by whom.
  • Corrective actions, including what happens to affected product.
  • Verification: calibration, record review, environmental swabbing.
  • A recall plan, written before you need it; see writing a recall plan.
  • Records made at the time of the activity, with actual values and initials, retained for the period the rule requires.

Under the full rules a preventive controls qualified individual prepares or oversees the plan, through recognized training such as the FSPCA courses or equivalent experience.

Where dairy plans commonly fall short

Pasteurization controls the raw milk hazard, yet many problems begin afterward: contaminated drains, hoses, fillers and hands. Ready-to-eat products such as fresh cheese, yogurt and ice cream need extra attention to sanitation and cold storage, and a swabbing routine finds trouble before product does. The daily steps are in clean-in-place basics.

Common plan errors to avoid

Avoid these:

  • Renaming a downloaded template and filing it.
  • Writing controls you do not perform.
  • Skipping the attestation.
  • Failing to revisit the plan after a new product, supplier or machine.

Inspectors compare paper to practice, as described in what dairy inspectors look for.

Quick answers

Is HACCP legally required for cheese?

There is no dairy-specific federal HACCP mandate. Most cheese plants fall under FSMA preventive controls or the qualified facility exemption, plus state rules.

Can I skip the plan if I qualify for the exemption?

You skip the full plan, not the duty. Good manufacturing practice, the attestation and state law still apply, and a short written plan is wise.

How long does a first plan take to write?

For a few products, often days or weeks of part-time work, mostly observing the process and collecting records. Schedule any required training before you open.

Sources and further reading

Reviewed 2026-11-23. Educational only; rules vary by state and locality, so confirm requirements with the agency or professional named in the article.

More from farm.FM Need a break from the paperwork? Farm humor and funny farm stories are always in season at farm.FM.